Eximkey - India Export Import Policy 2004 2013 Exim Policy
Procedure for claiming Deemed Export Drawback & Terminal Excise Duty Refund / Exemption

8.3.1

Procedure for claiming benefits under paragraphs 8.3(b) and (c) of FTP shall be as under:-

(i) An application in ANF 8 along with prescribed documents, shall be made by supplier to RA concerned. Recipient may also claim benefits on production of a suitable disclaimer from supplier along with a self declaration in the format given in Annexure II of ANF 8, regarding non-availment of CENVAT credit in addition to prescribed documents.

(ii) In case of supplies under paragraphs 8.2(a), (b) & (c) of FTP, claim shall be filed against receipt of payment through normal banking channel as in Appendix 22B. Claims should be filed within a period of twelve months from the date of payment. In cases where payment is received in advance, last date for submission of application may be correlated with date of supply instead of date of receipt of payment. Claim can be filed ‘Invalidation Letter / ARO wise’ against individual Authorisations within the time limit as specified above. 100% TED refund may be allowed after 100% supplies have been made physically and payment received at least up to 90%. However, grant of deemed export duty drawback will be limited to the extent of payment received.

(iii) In respect of supplies under paragraph 8.2(b) of FTP, where supplier wants to claim benefits from RA, RA shall allow deemed export benefits to DTA supplier, on receipt of certified copies of Central Excise attested invoice as proof of supplies made and / or Central Excise attested CT3 form and proof of validity of LoP. For supply of High Speed Diesel / Furnace Oil from Depots of domestic oil Public Sector Undertakings under Para 8.2 (b) of FTP, terminal excise duty shall be refunded on the basis of duty paid certificate issued by concerned domestic oil Public Sector Undertakings in the format given in Annexure I to ANF 8. Duty refund will be allowed for quantity of HSD / Furnace oil procured by EOU / EHTP / STP / BTP unit for its production activities, as certified by concerned DC / Bond authorities.

(iv) In respect of supplies under categories mentioned in paragraphs 8.2(d), (e), (f), (g), (h), (i) & (j) of FTP, claim may be filed either on the basis of proof of supplies effected or payment received. Claims should be filed within a period of twelve months from date of receipt of supplies by project authority or from date of receipt of the payment as per the option of applicant, either against a particular project or all the projects. Claims may also be filed where part payments have been received. 100% TED refund may be allowed after 100% supplies have been made physically and payment received at least up to 90%. However, grant of deemed export duty drawback will be limited to the extent of payment received.

Trade Intelligence
Search for latest information on item wise exports and imports, from all major Indian ports.

Username
Password